Maximum surface drying time for class C and Class D type plastic emulsion paint is
The correct answer for Maximum surface drying time for class C and Class D type plastic emulsion paint is 90 minutes.
If the optimistic time, most likely and pessimistic time for activity A are 4.6 and 8 respectively. What would be the expected time for completion of activity A?
If the optimistic time, most likely and pessimistic time for activity A are 4.6 and 8 respectively. Than expected time for completion of activity A is 6 days.
Which of the following activities is NOT included in cash flow?
ANSWER = [B] Estimating and costing activities
The rate of payment is made for 100 cu m (per % cu m) in case of
ANSWER = [D] All the above
The rate of an item of work depends on
ANSWER = [D] All the above
The main factor to be considered while preparing a detailed estimate, is
ANSWER = [D] All the above
Pick up the correct statement from the following:
ANSWER = [D] All the above
Brick walls are measured in sq. m if the thickness of the wall is
ANSWER = [A] 10 cm
The plinth area of a building does not includes
ANSWER = [D] Area of cantilevered porch
If the formation level of a highway has a uniform gradient for a particular length, and the ground is also having a longitudinal slope, the earthwork may be calculated by
ANSWER = [D] All the above